Draft for review — Greenville Kitchen & Bath. Structure follows Ben’s redesign plan. Copy is drawn from the company’s own 55 Google reviews and its own published pages — nothing here is invented.
25 Boland Court, Greenville, SC 29615·Mon–Fri 9:00am–5:00pmClient Login

Bathroom remodels

The tub-to-shower conversion

The most common thing we are asked for. A whirlpool nobody uses becomes a walk-in shower, or a wardrobe closet.

It starts with what you want the room to be — somewhere to sit in at the end of the day, or a room four people can get through before eight o’clock — and the design works back from there. A minor update and a complete overhaul run off the same list; it is the number of lines on it that changes.

  • Sinks, toilets, tubs and shower systems, classic through to contemporary
  • Curbless entries and bench seating where the layout allows it
  • Fittings chosen on feel as well as looks — they are what you touch every day
The tile work customers single out — Greenville Kitchen & Bath

Vanities and storage

Double vanities, tiling and trim by the same crew, so the joins line up across the whole room.

A vanity is storage and a statement at the same time — floating, to make a small room read bigger, or a traditional cabinet build with the drawers where you want them, paired with a surface that survives a decade of daily use.

  • Recessed niches, drawer inserts and a linen run built in rather than bolted on afterwards
  • Ceramic, porcelain and natural stone, chosen for slip resistance as much as for looks
  • Tile set by the person whose grout lines turn up in the reviews
Vanities, mirrors and the finish around them — Greenville Kitchen & Bath

Light, power and the things behind the wall

Moved properly rather than worked around — which is what decides whether the finish sits right.

Lighting a bathroom usually takes more than one circuit: bright and even at the mirror, where nobody wants a shadow across their face, and soft enough elsewhere to sit in the bath under. That gets decided at the design stage, not after the tile is on.

  • Plumbing and wiring relocated to suit the new layout, not the old one
  • Separate circuits for mirror, ceiling and any heat source
  • Low-flow toilets and faucets and efficient lighting where you want them
Where a tub used to be — Greenville Kitchen & Bath

How it runs

From the first conversation to the last tile

Four stages, in this order, every time.

  • We sit down with you. Your ideas, your preferences, what the room has to do.
  • A design plan, in 3D. Layout, materials, fixtures and finishes rendered so you can walk through the finished bathroom before anything is ordered.
  • Choosing materials. Taken through the selections at the Boland Court showroom, weighing how things look against how they wear.
  • Installation. Our own installers, not a rotating list of subcontractors — which is what decides whether a bathroom looks built or looks assembled.
Finished bathroom with shutters — Greenville Kitchen & Bath

Aging in place

A bathroom that still works in twenty years

Most people remodeling a bathroom in their fifties or sixties are remodeling it once. It is worth building it for the person who will be using it in 2046.

Walk-in tubs and curbless showers, grab bars set into blocking rather than screwed to tile, bench seating, a comfort-height vanity, lever taps, and door widths and turning space a walker or a chair can actually use. None of it has to look clinical — it is the same tile and the same cabinetry, planned once at the design stage instead of retrofitted after a fall.

Walk-in shower with bench seating — Greenville Kitchen & Bath

The rest of what we do

Most customers come back for the next room. These are the ones they come back for.