Draft for review — Greenville Kitchen & Bath. Structure follows Ben’s redesign plan. Copy is drawn from the company’s own 55 Google reviews and its own published pages — nothing here is invented.
25 Boland Court, Greenville, SC 29615·Mon–Fri 9:00am–5:00pmClient Login

Exterior remodels

Doors and what is behind them

Rot cut back and rebuilt before anything new goes on, and reported to you before it is closed up.

A door frame is where water gets into a house, so what is behind one is rarely as good as what is in front of it. How much has to come out is not knowable until it is open — which is why you get told, with photographs, before it is closed back up rather than after.

  • Front doors, sidelights and entry systems replaced
  • Frames, sills and thresholds rebuilt rather than packed out
  • Rot cut back to sound timber before anything new goes on
  • What is found behind the old work reported to you, with photographs
Doors and what is behind them — Greenville Kitchen & Bath

Siding, timber and paint

Repaired or replaced rather than covered over, and prepared properly before a coat goes on.

Most of the cost of an exterior job is preparation, and so is most of the difference in how long it lasts. Washing, scraping and priming take longer than the finish coat and are the part that is invisible in the photographs — and the part that decides whether you are doing this again in four years.

  • Damaged boards and trim replaced rather than painted over
  • Surfaces washed, scraped and primed before the finish coat
  • Fascia, soffit and trim handled with the siding rather than as a separate visit
  • Work areas cleared down at the end of each day
Siding, timber and paint — Greenville Kitchen & Bath

The rest of what we do

Most customers come back for the next room. These are the ones they come back for.